loading

Focusing on precision metal parts manufacturing

            Email: sunny@foxron.cn

Introduction to acceptance requirements and acceptance procedures of parts and components in machining

by:Foxron     2021-11-21
What is included in the acceptance of parts and components in machining? Specifically, including acceptance requirements and acceptance procedures, we will introduce the two parts of acceptance requirements and acceptance procedures, as follows. 1. Acceptance requirements 1. Visual inspection (1) Check whether the finish of the machined parts meets the requirements of the drawings. (2) Check whether the appearance of the machined parts is damaged, rusted, bruised, and whether the thread shape and angle are correct. (3) If the above problems are found, detailed records should be made for future reference. 2. Quantity acceptance (1) Based on the supply contract and processing voucher, check the material, specifications, and quantity of the processed parts strictly against the drawings, and check and verify the parts one by one. (2) Make a record of quantity acceptance, indicating the place, time, participants, type, product name, expected and actual quantity. 3. Quality acceptance (1) Assemble in strict accordance with the regulations and procedures required by the final assembly drawings. (2) Make records carefully during quality acceptance. In case of quality problems with processed parts, the outsourcing processing unit shall be notified in writing of the details. Decide whether to return or replace the goods according to the situation. (3) If there are special requirements, the processing unit can be found for joint acceptance and assembly, and the acceptance document can be signed after the installation is qualified. 2. Acceptance procedure 1. After receiving the machined parts, a full-time acceptance staff shall be sent to check and accept the materials, specifications, models, and quantities of the machined parts according to the requirements of the contract and the drawings. 2. The acceptance period is generally 1-2 days. In special circumstances, the effect of use is determined. In case of quality problems, the processing unit may return the goods, claim compensation, and the processing unit shall bear the economic loss. 3. Generally, the processing contract signed by the non-production department will be directly checked and accepted by the department used, and the acceptance report will be filled out. 4. For the unqualified parts and components, the inspector must go through the inspection, repair and return procedures within the specified acceptance period. 5. For the acceptance of special precision machined parts and components, the full-time acceptance personnel shall organize relevant personnel to jointly accept the acceptance, and fill in the acceptance report in detail. For the unqualified parts and components, it is necessary to fill in the inspection declaration form in detail, as a condition for improving the processing accuracy and determining the selection direction of the future parts and components outsourcing processing factory. Unless otherwise specified, the article is an original article for Tiecheng Machinery's precision machinery parts processing, welcome to reprint! Please indicate the address of this article for reprinting, thank you. Article source: http://www.wxdtc.com/news.asp
Custom message
Chat Online
Chat Online
Leave Your Message inputting...